banner-alt

Projects

Al Maktoum International Airport

The project involves an airport city with six runways and terminal facilities, which accommodate 160 million annual passengers, 10 million tons of cargo, and a Logistics City.

Phase 1 of the Dubai World Central Al Maktoum International Airport is completed and fully operational. The international airport currently has the capacity to handle 600,000 tonnes per annum and operates 24 hours a day on an A380-compatible, 4.5 km runway. Facilities include 64 aircraft stands, a state-of-the-art ATC Tower, fire stations, line maintenance services, a fuel farm and a 710,418 sq ft, single-level passenger terminal.

Client

Dubai Civil Aviation Authority (DCAA)

Architect

Leslie Jones Architecture

Main Contractors

Kharafi National (CUC Contractor) Aeradio (Meteorological Systems) Northropp Grumman (Radar Operations) Thermo L.L.C. (Fuel Farm) Amana Steel (Fuel Farm

What our clients say!

Consort Architectural Hardware